Hungarian Green Energy Goals: Industrial Developments and Grid Integration by 2030
Industrial power plants and storage facilities can be connected to the grid by 2030, the Ministry of Energy announced. The current energy storage capacity of only twenty megawatts could increase twentyfold by 2026 and fiftyfold by 2030.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed